feat: add generated scene skill platform hardening
This commit is contained in:
@@ -0,0 +1,53 @@
|
||||
# Boundary Fail-Closed Decision Report
|
||||
|
||||
Date: 2026-04-19
|
||||
|
||||
Parent framework: `2026-04-19-scene-skill-102-full-coverage-framework-plan`
|
||||
|
||||
Parent route: `Route 5 / boundary-family fail-closed`
|
||||
|
||||
Plan: `2026-04-19-boundary-fail-closed-decision-plan.md`
|
||||
|
||||
## Scope
|
||||
|
||||
This is a decision-only route. It does not change analyzer/generator code and does not update the execution board.
|
||||
|
||||
Fixed Route 5 input buckets:
|
||||
|
||||
| Bucket | Count |
|
||||
| --- | ---: |
|
||||
| `local_doc_pipeline` | 5 |
|
||||
| `host_bridge_workflow` | 1 |
|
||||
| `page_state_eval/bootstrap_target` | 1 |
|
||||
|
||||
## Decisions
|
||||
|
||||
| Bucket | Decision | Reason |
|
||||
| --- | --- | --- |
|
||||
| `local_doc_pipeline` | `hold-as-boundary-fail-closed` | Requires local document runtime and attachment handling beyond the current full-coverage implementation routes. |
|
||||
| `host_bridge_workflow` | `hold-as-boundary-fail-closed` | Remaining boundary record depends on host bridge execution semantics outside this decision-only route. |
|
||||
| `page_state_eval/bootstrap_target` | `isolate-bootstrap-target` | Bootstrap target resolution is a separate navigation/login target problem and must stay isolated from contract recovery. |
|
||||
|
||||
## Result
|
||||
|
||||
Route 5 produces no code-level coverage delta. Its expected delta is decision quality:
|
||||
|
||||
- unresolved boundary ambiguity: `0`
|
||||
- open boundary implementation slices: `0`
|
||||
- held/deferred boundary records: `7`
|
||||
|
||||
## Boundary
|
||||
|
||||
This route did not:
|
||||
|
||||
- modify `src/generated_scene/analyzer.rs`
|
||||
- modify `src/generated_scene/generator.rs`
|
||||
- update `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
||||
- start boundary implementation
|
||||
- create a new family
|
||||
|
||||
## Stop Statement
|
||||
|
||||
Route 5 is decision-complete. The next child plan in the 102 full-coverage sequence is Route 6:
|
||||
|
||||
`2026-04-19-promotion-and-board-reconciliation-policy-plan.md`
|
||||
Reference in New Issue
Block a user