feat: add generated scene skill platform hardening
This commit is contained in:
@@ -0,0 +1,39 @@
|
||||
# G1-E Remaining Fail-Closed Closure Design
|
||||
|
||||
> Date: 2026-04-19
|
||||
> Status: Draft
|
||||
> Parent Framework Plan: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md`
|
||||
> Parent Route: `Route 4: G1-E / single_request_enrichment`
|
||||
> Parent Layer: `Layer C + Layer D`
|
||||
|
||||
## Intent
|
||||
|
||||
Reduce the remaining `G1-E / single_request_enrichment` structured fail-closed bucket after Routes 2 and 3 are complete or deferred.
|
||||
|
||||
## Fixed Input Bucket
|
||||
|
||||
`single_request_enrichment = 2`
|
||||
|
||||
## Allowed Files
|
||||
|
||||
1. `src/generated_scene/analyzer.rs`
|
||||
2. `src/generated_scene/generator.rs`
|
||||
3. `src/generated_scene/ir.rs`
|
||||
4. `tests/scene_generator_test.rs`
|
||||
5. Route 4 local inventory and report assets
|
||||
|
||||
## Forbidden Files
|
||||
|
||||
1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`
|
||||
2. Route 2 and Route 3 assets
|
||||
3. Route 5+ assets
|
||||
|
||||
## Expected Delta
|
||||
|
||||
1. reduce the remaining `G1-E` fail-closed bucket
|
||||
2. preserve current real-sample `G1-E` pass
|
||||
|
||||
## Stop Rule
|
||||
|
||||
Stop after the Route 4 bucket is rerun and either reduced or explicitly deferred.
|
||||
|
||||
Reference in New Issue
Block a user