# G2 Residual 2 Readiness Closure Report > Date: 2026-04-19 > Plan: `docs/superpowers/plans/2026-04-19-g2-residual-2-readiness-closure-plan.md` ## Scope This bounded route inspected and reran the two fixed G2 residual structured fail-closed scenes. It did not enter G1-E, G3, or boundary residual work. ## Summary | Status | Count | | --- | ---: | | pass | 2 | | fail-closed | 0 | | source-unreadable | 0 | | unknown | 0 | ## Scene Results | Scene | Status | Readiness | Archetype | Modes | G2 Gates | | --- | --- | --- | --- | --- | --- | | 白银线损周报 | pass | A | multi_mode_request | diagnosis | modes=True; request=True; response=True | | 台区线损大数据-月_周累计线损率统计分析 | pass | A | multi_mode_request | month, week | modes=True; request=True; response=True | ## Decision - The fixed `02` and `00` readiness labels are not remaining contract gaps after route-local rerun. - Both scenes resolve to `multi_mode_request` with G2 mode, request, and response gates passing. - No additional analyzer or generator implementation change was required by this route. ## Stop Statement The two-scene route-local follow-up and report are published. No G1-E, G3, or boundary residual work is started by this plan.