# G3 Export Plan Closure Report > Date: 2026-04-19 > Parent Plan: `docs/superpowers/plans/2026-04-19-g3-export-plan-closure-plan.md` > Parent Route: `Route 2: G3 / paginated_enrichment` ## Scope This report closes the bounded `G3` export-plan subgroup: `paginated_enrichment + g3_export_plan + export_plan` The implementation only recovered missing export-plan evidence. It did not continue into residual Route 2 closure work. ## Implementation Slice The bounded slice was implemented in: 1. `src/generated_scene/analyzer.rs` 2. `tests/scene_generator_test.rs` The recovery logic now recognizes `exportWord`-style export signals as valid `G3` export evidence, allowing export-plan closure without relaxing any workflow gate. ## Bounded Validation Validated scene: 1. `sweep-002-95598-12398` ## Before / After 1. `sweep-002-95598-12398` Before: `fail-closed / C / exportPlan = null` After: `pass / A / exportPlan.entry = exportWord` The failed gates that previously remained: 1. `workflow_contract_complete: export_plan` 2. `workflow_complete_for_archetype: export_plan` 3. `g3_export_path_identified: g3_export_plan` were eliminated by the bounded export evidence recovery slice. ## Coverage Delta Fixed input count: 1. before: `1` 2. resolved by this plan: `1` 3. residual after this plan: `0` ## Route 2 Residual After the enrichment-request closure plan and this export-plan closure plan: 1. the targeted enrichment subgroup has been resolved 2. the targeted export subgroup has been resolved 3. residual Route 2 work, if any, must be handled under the separate residual-contract child plan ## Completion This child plan is complete because: 1. the fixed export-plan subgroup count is lower 2. bounded rerun was completed 3. stable `G3` canonical tests were preserved ## Stop Statement This report closes the export-plan child plan. Do not continue into Route 2 residual closure under this plan.