# G6 Host-Bridge Entry Readiness Closure Report > Date: 2026-04-19 > Plan: [2026-04-19-g6-host-bridge-entry-readiness-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-entry-readiness-plan.md) ## Result This plan is closed with one bounded semantic-readiness threshold: 1. `semantic-ready` ## What Was Closed 1. `G6` future entry prerequisites are now split into required vs optional-later 2. the minimum readiness threshold is now explicit 3. one bounded follow-up `design + plan` now exists ## Hold Result The following direction remains untouched: 1. `G8 local-doc prerequisites` ## Next Step Execute the bounded `G6 host-bridge entry gate` plan rather than reopening this readiness slice.