# Official Board Reconciliation Report > Date: 2026-04-19 > Plan: `docs/superpowers/plans/2026-04-19-official-board-reconciliation-plan.md` > Parent Framework: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md` > Status: Completed ## Scope This report records the official execution board reconciliation from the final 102-scene coverage rollup. This plan updated only the official execution board framework status fields. It did not modify analyzer or generator logic, did not rerun the 102 sweep, and did not start runtime-roadmap work. ## Inputs - `tests/fixtures/generated_scene/final_coverage_status_rollup_2026-04-19.json` - `tests/fixtures/generated_scene/promotion_board_reconciliation_policy_2026-04-19.json` - `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` ## Updated Board - `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` The board now contains framework-level fields for every scene: - `currentFrameworkStatus` - `currentFrameworkCandidateStatus` - `currentFrameworkArchetype` - `currentFrameworkReadiness` - `currentFrameworkSource` - `currentFrameworkDecisionOverlay` - `currentFrameworkNextAction` - `currentFrameworkCanAutoUpdateBoard` Frozen workbook snapshot fields were preserved. ## Final Framework Status Counts | Framework status | Count | | --- | ---: | | `framework-auto-pass` | 95 | | `framework-structured-fail-closed` | 7 | | `framework-valid-host-bridge` | 0 | | `source-unreadable` | 0 | | `missing-source` | 0 | | `unsupported-family` | 0 | | `misclassified-unresolved` | 0 | | `unresolved-followup-status` | 0 | ## Remaining Structured Fail-Closed Records | Scene ID | Scene | Overlay | Next action | | --- | --- | --- | --- | | `sweep-033-scene` | `供电可靠率指标统计表` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` | | `sweep-034-scene` | `供电可靠性数据质量自查报告月报` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` | | `sweep-042-scene` | `国网金昌供电公司营商环境周例会报告` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` | | `sweep-051-scene` | `嘉峪关可靠性分析报告` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` | | `sweep-074-scene` | `同兴智能安全督查日报` | `hold-for-local-doc-runtime-roadmap` | `future-local-doc-runtime-roadmap-input` | | `sweep-085-scene` | `业扩报装管理制度` | `hold-for-host-bridge-runtime-roadmap` | `future-host-bridge-runtime-roadmap-input` | | `sweep-091-scene` | `用户停电频次分析监测` | `isolate-bootstrap-target-residual` | `future-bootstrap-target-normalization-roadmap-input` | ## Reconciliation Asset - `tests/fixtures/generated_scene/official_board_reconciliation_2026-04-19.json` ## Conclusion Official board reconciliation is complete. The 102-scene board now has no unresolved framework status. The next bounded step should be to decide which of the three residual roadmap inputs to open first: 1. local-doc runtime roadmap for the five `local_doc_pipeline` residuals; 2. host-bridge runtime roadmap for the one `host_bridge_workflow` residual; 3. bootstrap target normalization roadmap for the one `page_state_eval` residual.