# G6 Real-Sample Entry Preparation And Bounded Execution Closure Report > Date: 2026-04-19 > Plan: `docs/superpowers/plans/2026-04-19-g6-real-sample-entry-preparation-and-bounded-execution-plan.md` > Status: Closed ## Scope This report closes the unified `G6` bounded execution plan. The execution stayed inside the plan boundary: 1. no new `G6` semantic sub-plan was created 2. no `G7` or `G8` implementation was reopened 3. no `G4 / G5` scope was opened 4. only one fixed `G6` real sample was executed ## Fixed Sample `电能表现场检验完成率指标报表` Source: `D:/desk/智能体资料/全量业务场景/一平台场景/电能表现场检验完成率指标报表` Generated package: `examples/g6_real_sample_validation/skills/g6-real-meter-inspection-completion` ## Implementation Slice The bounded implementation slice corrected the real-sample routing boundary: 1. the fixed mixed sample no longer collapses into `local_doc_pipeline` 2. `faultYoYExportXLSX` and `faultDetailsExportXLSXS` no longer force `G8` classification by themselves 3. the fixed host-bridge plus callback plus business-endpoint sample stays on `host_bridge_workflow` No generic host-runtime platform redesign was introduced. ## Execution Result The fixed sample was rerun with: ```powershell cargo run --bin sg_scene_generate -- --source-dir "D:/desk/智能体资料/全量业务场景/一平台场景/电能表现场检验完成率指标报表" --scene-id g6-real-meter-inspection-completion --scene-name "电能表现场检验完成率指标报表" --scene-kind report_collection --output-root "D:/data/ideaSpace/rust/sgClaw/claw-new/examples/g6_real_sample_validation" ``` Observed result: 1. `workflowArchetype = host_bridge_workflow` 2. `readiness.level = A` 3. `g6_host_bridge_detected = passed` 4. `g6_fail_closed = passed` Final validation state: `executed-pass` ## Validation Writeback The following assets were updated: 1. `tests/fixtures/generated_scene/real_sample_validation_records_2026-04-18.json` 2. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 3. `tests/fixtures/generated_scene/boundary_runtime_entry_rules_2026-04-18.json` `rsv-g6-001` is now recorded as the bounded real-sample execution record for `G6`. ## Closure This line is closed under the non-negotiable stop rule in the plan. Do not create another `G6` semantic micro-plan from this result. Any future `G6` work must start from a new bounded implementation or validation roadmap.