# Boundary Runtime Prerequisites Roadmap Closure Report > Date: 2026-04-19 > Roadmap: [2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md) ## Result This roadmap is closed with one bounded next direction: 1. `G6 host-bridge prerequisites` ## What Was Closed 1. `G6` and `G8` no longer compete ambiguously at the prerequisite level 2. one follow-up bounded `design + plan` now exists for the selected prerequisite direction ## Hold Result The following direction remains held: 1. `G8 local-doc prerequisites` The deferred families remain untouched: 1. `G4` 2. `G5` ## Next Step Execute the bounded `G6 host-bridge prerequisites` plan rather than reopening this roadmap.