# Deferred Family Entry Decision > Date: 2026-04-19 > Roadmap: `docs/superpowers/plans/2026-04-18-scene-skill-real-sample-validation-roadmap-plan.md` ## Decision `G4` and `G5` do not enter the next roadmap. Current status remains: 1. `G4`: deferred 2. `G5`: degraded ## Reason The current validation evidence does not justify opening deferred families. The strongest observed pressure is still: 1. `G3` real-sample archetype collapse 2. `G2` real-sample contract mismatch Opening `G4/G5` before addressing those mainline failures would violate the bounded-scope rule of the roadmap. ## Updated Scope Boundary The next roadmap remains limited to: 1. executed mainline mismatch correction The next roadmap remains closed to: 1. `G4` implementation 2. `G5` implementation