# G2 Remaining Fail-Closed Closure Report Date: 2026-04-19 Parent framework: `2026-04-19-scene-skill-102-full-coverage-framework-plan` Parent route: `Route 3 / G2 multi_mode_request closure` Plan: `2026-04-19-g2-remaining-fail-closed-closure-plan.md` ## Scope This report closes the fixed Route 3 bucket: - `multi_mode_request` structured fail-closed scenes: `4` - Primary blocker: `g2_request_contract` / `request_mode_contract` - Allowed implementation area: bounded G2 mode request contract closure This run did not update `scene_execution_board_2026-04-18.json`, did not create a new family, and did not begin Route 4. ## Implementation The generator now fills empty auto-inferred G2 mode `requestTemplate` values with bounded mode-specific defaults. Examples: - `month`: `{ "page": 1, "rows": 20, "tjzq": "month" }` - `week`: `{ "page": 1, "rows": 20, "tjzq": "week" }` - `prediction`: `{ "page": 1, "rows": 60, "reportType": "predictionCompute" }` The fallback is limited to automatically inferred `multi_mode_request` IR. Explicitly provided incomplete `scene_ir_json` remains fail-closed. ## Results | Scene ID | Scene | Baseline | Follow-up | Result | | --- | --- | --- | --- | --- | | `sweep-020-scene` | `供电所线路电量统计` | `C / fail-closed` | `A / auto-pass` | resolved | | `sweep-023-scene` | `供电质量看板-武威` | `C / fail-closed` | `A / auto-pass` | resolved | | `sweep-070-scene` | `电量、站损自动采集上报` | `C / fail-closed` | `A / auto-pass` | resolved | | `sweep-083-scene` | `营销业务管控监测日报表` | `C / fail-closed` | `A / auto-pass` | resolved | Summary: - Before: `4` G2 structured fail-closed scenes - Resolved to auto-pass: `4` - Remaining Route 3 fail-closed: `0` - Route-local coverage delta: `+4` ## Verification Commands: ```powershell cargo test --test scene_generator_test generator_fills_empty_g2_mode_request_templates -- --nocapture cargo test --test scene_generator_test generator_blocks_incomplete_multi_mode_contract -- --nocapture ``` Route-local rerun output: ```text examples/g2_remaining_fail_closed_closure_followup_2026-04-19 ``` ## Stop Statement Route 3 is closed. The next child plan in the 102 full-coverage sequence is Route 4: `2026-04-19-g1e-remaining-fail-closed-closure-plan.md`