# G6 Host-Bridge Entry Gate Closure Report > Date: 2026-04-19 > Plan: [2026-04-19-g6-host-bridge-entry-gate-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-entry-gate-plan.md) ## Result This plan is closed with one bounded future entry gate model: 1. three hard gate conditions 2. two soft conditions 3. three fail-close reasons ## What Was Closed 1. `G6` future entry gate is now explicit 2. hard vs soft conditions are now separated 3. one bounded follow-up `design + plan` now exists ## Hold Result The following direction remains untouched: 1. `G8 local-doc prerequisites` ## Next Step Execute the bounded `G6 host-bridge entry gate verification` plan rather than reopening this gate slice.