# 102 Framework Closure Rollup Design > Date: 2026-04-19 > Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md` ## Intent Publish the final framework-level status for all 102 scenes after the final-2 residual sequence. This is a reporting layer, not an implementation layer. ## Closure States The rollup must distinguish: 1. full framework auto-pass 2. named structured hold 3. unresolved status The target is `unresolved = 0`.