# 102 Full Coverage Follow-Up Sweep And Reconciliation Design > Date: 2026-04-19 > Status: Draft > Parent Framework Plan: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md` > Parent Child Sequence: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-child-plan-sequence-plan.md` > Parent Layer: `Layer E` ## Intent Run one full 102-scene follow-up sweep after Routes 2 through 6 are complete, then publish a reconciliation candidate view governed by the Route 6 promotion policy. This design measures cumulative coverage delta. It does not directly update the official execution board. ## Inputs 1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 2. Route 2 follow-up assets 3. Route 3 follow-up assets 4. Route 4 follow-up assets 5. Route 5 boundary decisions 6. Route 6 promotion policy ## Output Assets 1. `tests/fixtures/generated_scene/full_coverage_followup_sweep_2026-04-19.json` 2. `tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json` 3. `docs/superpowers/reports/2026-04-19-102-full-coverage-followup-sweep-report.md` 4. `docs/superpowers/reports/2026-04-19-102-full-coverage-reconciliation-candidates-report.md` ## Status Model The sweep must report: 1. `auto-pass` 2. `fail-closed-known` 3. `adjudicated-valid-host-bridge` 4. `source-unreadable` 5. `missing-source` 6. `unsupported-family` 7. `misclassified-unresolved` The reconciliation candidate view must also report: 1. `framework-auto-pass-candidate` 2. `framework-structured-fail-closed` 3. `framework-valid-host-bridge` 4. `hygiene-pass-candidate` 5. `hygiene-fail-closed-candidate` ## Guardrails 1. Do not modify `src/generated_scene/analyzer.rs`. 2. Do not modify `src/generated_scene/generator.rs`. 3. Do not update `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json`. 4. Do not promote scenes directly. 5. Do not open a new family. 6. Do not start implementation work from the sweep result. ## Completion Criteria 1. A fixed 102-scene sweep result exists. 2. A reconciliation candidate asset exists. 3. Coverage delta is reported against the previous structured follow-up baseline. 4. The report states the remaining gap to the 102-scene target.