# Final 2 Residual Roadmap Prioritization Report > Date: 2026-04-19 > Plan: `2026-04-19-final-2-residual-roadmap-prioritization-plan.md` > Parent sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md` ## Scope This decision consumed the current official board state after local-doc reconciliation refresh. Only two framework structured fail-closed residuals remain: | Scene id | Scene name | Current archetype | Next action | | --- | --- | --- | --- | | `sweep-085-scene` | `计量资产库存统计` | `host_bridge_workflow` | `future-host-bridge-runtime-roadmap-input` | | `sweep-091-scene` | `配网异常设备监控统计` | `page_state_eval` | `future-bootstrap-target-normalization-roadmap-input` | No code was changed, and the official board was not updated by this plan. ## Decision Selected first roadmap: `bootstrap target normalization roadmap` Selected plan: `2026-04-19-bootstrap-target-normalization-roadmap-plan.md` ## Rationale Bootstrap target normalization is the narrower next step: 1. It is a single-scene residual. 2. It targets deterministic bootstrap target recovery or a narrower named hold. 3. It avoids host-runtime transport semantics. 4. It has lower regression risk against already passing host-bridge paths. Host-bridge runtime remains queued: `2026-04-19-host-bridge-runtime-roadmap-plan.md` ## Output Asset Decision asset: `tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json` ## Closure This prioritization plan is complete. The next executable plan is: `docs/superpowers/plans/2026-04-19-bootstrap-target-normalization-roadmap-plan.md`