# G6 Host-Bridge Callback Semantics Closure Report > Date: 2026-04-19 > Plan: [2026-04-19-g6-host-bridge-callback-semantics-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-callback-semantics-plan.md) ## Result This plan is closed with one bounded callback completion model: 1. `ok` 2. `partial` 3. `blocked` 4. `error` ## What Was Closed 1. `G6` callback completion logic is no longer implicit 2. the bounded state priority is now explicit 3. one bounded follow-up `design + plan` now exists ## Hold Result The following direction remains untouched: 1. `G8 local-doc prerequisites` ## Next Step Execute the bounded `G6 host-bridge callback state verification` plan rather than reopening this callback-semantics slice.