# G6 Host-Bridge Execution Semantics Closure Report > Date: 2026-04-19 > Plan: [2026-04-19-g6-host-bridge-execution-semantics-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-g6-host-bridge-execution-semantics-plan.md) ## Result This plan is closed with two bounded semantic seams: 1. `host-bridge-action-invocation` 2. `callback-request-completion` ## What Was Closed 1. `G6` no longer carries a single broad semantic gap 2. the minimum semantic model is now explicit 3. one bounded follow-up `design + plan` now exists ## Hold Result The following direction remains untouched: 1. `G8 local-doc prerequisites` ## Next Step Execute the bounded `G6 host-bridge callback semantics` plan rather than reopening this semantic slice.