# Post-G7 Boundary Decision Report > Date: 2026-04-19 > Roadmap: [2026-04-19-post-g7-boundary-decision-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-post-g7-boundary-decision-roadmap-plan.md) ## Decision One bounded next direction is selected: 1. `prerequisites-only hold` The following boundary families remain held: 1. `G6` 2. `G8` ## Comparison Result ### G6 `G6` still needs stronger host-bridge real execution semantics than the current bounded next-step budget allows. So `G6` remains held. ### G8 `G8` still needs local document runtime and attachment handling beyond current repo-local coverage. So `G8` remains held. ### Prerequisites-Only Hold After `G7` has already closed as an executed boundary-family sample, the safest bounded next step is no longer another direct family-entry attempt. The smaller next direction is to scope the remaining prerequisites first. So `prerequisites-only hold` is selected. ## Result The roadmap now has one bounded next direction: 1. `boundary runtime prerequisites roadmap` This report does not implement any prerequisite. It only closes the post-`G7` boundary ambiguity.