# Host-Bridge Runtime Roadmap Design > Date: 2026-04-19 > Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md` > Fixed Scene: `sweep-085-scene` ## Intent Close or narrow the remaining host-bridge runtime residual without resurrecting the old G6 semantics micro-plan chain. ## Fixed Scope Only `sweep-085-scene` is in scope. ## Minimal Success Definition The scene must either: 1. become `framework-auto-pass-candidate`; or 2. remain `framework-structured-fail-closed` with a narrower named host-bridge runtime hold. ## Forbidden Scope 1. no general host-runtime transport implementation 2. no new G6 semantics micro-plan 3. no changes to G1-E/G2/G3 routes 4. no new family