# Post-Roadmap Execution Closure Report > Date: 2026-04-18 > Scope: `docs/superpowers/plans/2026-04-18-scene-skill-post-roadmap-execution-plan.md` > Result: Completed ## 1. Conclusion The post-roadmap execution plan has been closed within its own boundary. The completed outputs now exist for all required phases: 1. Phase 0: handover boundary asset 2. Phase 1: minimum current execution board 3. Phase 2: real-sample validation layer 4. Phase 3: boundary and runtime entry rules 5. Phase 4: bounded next-roadmap design and plan ## 2. Delivered Assets ### Phase 0 1. `tests/fixtures/generated_scene/post_roadmap_handover_2026-04-18.json` ### Phase 1 1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` ### Phase 2 1. `tests/fixtures/generated_scene/real_sample_validation_plan_2026-04-18.json` 2. `tests/fixtures/generated_scene/real_sample_validation_record_template_2026-04-18.json` 3. `tests/fixtures/generated_scene/real_sample_validation_records_2026-04-18.json` 4. `tests/fixtures/generated_scene/real_sample_mismatch_taxonomy_2026-04-18.json` ### Phase 3 1. `tests/fixtures/generated_scene/boundary_runtime_entry_rules_2026-04-18.json` ### Phase 4 1. `docs/superpowers/specs/2026-04-18-scene-skill-real-sample-validation-roadmap-design.md` 2. `docs/superpowers/plans/2026-04-18-scene-skill-real-sample-validation-roadmap-plan.md` ## 3. Key Outcome The most important change is not a new compiler feature. It is the separation of: 1. frozen workbook snapshot 2. current execution-board state 3. real-sample validation state 4. next-roadmap scope decisions That separation prevents the next execution round from drifting back into asset-only refinement. ## 4. Real-Sample Validation Status The first-round validation layer now records: 1. `G2` as an executed mismatch anchor 2. `G1-E` as an executed pass anchor 3. `G3` as a selected real-sample anchor that still needs an executed real run This means the next roadmap can be validation-first rather than fixture-first. ## 5. Boundary Control `G6/G7/G8` remain boundary families. `G4/G5` remain deferred or degraded. No new implementation scope was opened inside this plan. ## 6. Verification The post-roadmap execution assets are now covered by: 1. `cargo test --test post_roadmap_execution_assets_test -- --nocapture` This verification is in addition to the already existing family, ledger, and roadmap asset tests.