# G3 Enrichment Request Closure Report > Date: 2026-04-19 > Parent Plan: `docs/superpowers/plans/2026-04-19-g3-enrichment-request-closure-plan.md` > Parent Route: `Route 2: G3 / paginated_enrichment` ## Scope This report closes the bounded `G3` subgroup: `paginated_enrichment + g3_enrichment_contract + secondary_request` The implementation only recovered missing enrichment-request contract evidence. It did not absorb export-plan closure work. ## Implementation Slice The bounded slice was implemented in: 1. `src/generated_scene/generator.rs` 2. `tests/scene_generator_test.rs` The recovery logic now prefers existing enrichment candidates from: 1. endpoint-backed request templates 2. `g1e_enrichment_endpoints` 3. `g3_business_endpoint_names` 4. secondary-request-aligned endpoint heuristics No Route 3+ files or execution-board assets were changed. ## Bounded Validation Validated scenes: 1. `sweep-001-95598-12398` 2. `sweep-008-95598` 3. `sweep-002-95598-12398` ## Before / After ### Resolved 1. `sweep-001-95598-12398` Before: `fail-closed / C / enrichmentRequests = 0` After: `pass / A / enrichmentRequests = 2` 2. `sweep-008-95598` Before: `fail-closed / C / enrichmentRequests = 0` After: `pass / A / enrichmentRequests = 3` ### Residual 1. `sweep-002-95598-12398` Before: `fail-closed / C / enrichmentRequests = 0` After: still `fail-closed / C` The residual blocker is no longer treated as the enrichment-request subgroup target. It remains bounded as: 1. `g3_export_plan` 2. `export_plan` This residual is explicitly handed to: `docs/superpowers/plans/2026-04-19-g3-export-plan-closure-plan.md` ## Coverage Delta Fixed input count: 1. before: `3` 2. resolved by this plan: `2` 3. residual handed off: `1` ## Completion This child plan is complete because: 1. the targeted enrichment-request subgroup has a measured before/after count 2. the subgroup was reduced without route drift into `host_bridge_workflow` 3. the remaining unresolved scene was explicitly bounded as export-plan residual ## Stop Statement This report closes the enrichment-request child plan. Do not continue into export-plan closure work under this plan.