# Boundary Runtime Prerequisites Roadmap Design > Date: 2026-04-19 > Status: Draft > Upstream Decision: [2026-04-19-post-g7-boundary-decision-report.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/reports/2026-04-19-post-g7-boundary-decision-report.md) ## 1. Intent This design defines the next bounded slice after the post-`G7` boundary decision selects `prerequisites-only hold`. The target is: `boundary runtime prerequisites roadmap` ## 2. Why This Direction This direction is selected because: 1. `G7` is already closed and should not be reopened 2. `G6` still depends on stronger host-bridge real execution semantics 3. `G8` still depends on local document runtime and attachment handling 4. forcing either family into execution now would exceed the bounded next-step budget ## 3. Scope Boundary This design is limited to prerequisite scoping only. It may include: 1. separating `G6` prerequisite pressure from `G8` prerequisite pressure 2. defining the minimum prerequisite slice needed before either family can enter real-sample scope 3. selecting one bounded prerequisite direction It must not include: 1. executing `G6` or `G8` 2. implementing host-runtime or local-doc runtime directly 3. reopening `G7` 4. reopening `G1-E / G2 / G3` 5. opening `G4 / G5` ## 4. Target Outcome The bounded target outcome is one of two states: 1. a selected prerequisite direction for `G6` 2. or a selected prerequisite direction for `G8` The design rejects direct family execution under this slice. ## 5. Exit Condition This design is complete when implementation can be bounded to one roadmap that: 1. compares `G6` and `G8` prerequisite burden directly 2. selects exactly one prerequisite direction 3. publishes one bounded follow-up plan