# Official Board Reconciliation Design > Date: 2026-04-19 > Parent Framework: `2026-04-19-scene-skill-102-full-coverage-framework-design.md` > Parent Layer: `Layer E` > Status: Active ## Intent Apply the final 102-scene coverage rollup to the official execution board in a controlled, auditable way. This design is the only point where `scene_execution_board_2026-04-18.json` may be updated from the final coverage rollup. ## Inputs 1. `tests/fixtures/generated_scene/final_coverage_status_rollup_2026-04-19.json` 2. `tests/fixtures/generated_scene/promotion_board_reconciliation_policy_2026-04-19.json` 3. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` ## Outputs 1. updated `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 2. `tests/fixtures/generated_scene/official_board_reconciliation_2026-04-19.json` 3. `docs/superpowers/reports/2026-04-19-official-board-reconciliation-report.md` ## Status Mapping 1. `framework-auto-pass-candidate` maps to `framework-auto-pass`. 2. `framework-structured-fail-closed` maps to `framework-structured-fail-closed`. 3. `framework-valid-host-bridge` maps to `framework-valid-host-bridge`. 4. unresolved raw statuses remain explicit and must not be collapsed. ## Board Fields The reconciliation may add or update only current framework fields: 1. `currentFrameworkStatus` 2. `currentFrameworkArchetype` 3. `currentFrameworkReadiness` 4. `currentFrameworkSource` 5. `currentFrameworkDecisionOverlay` 6. `currentFrameworkNextAction` 7. `currentFrameworkCanAutoUpdateBoard` Existing frozen workbook snapshot fields must be preserved. ## Boundary This design must not: 1. modify `src/generated_scene/analyzer.rs`; 2. modify `src/generated_scene/generator.rs`; 3. rerun the 102 sweep; 4. promote real-sample validation status; 5. remove existing snapshot fields from the board. ## Acceptance Criteria 1. Official board still contains exactly `102` scenes. 2. Final framework status counts are `95` framework auto-pass and `7` structured fail-closed. 3. No unresolved framework status remains. 4. Reconciliation JSON records all updated scenes. 5. Report explains the remaining `7` residuals and the next roadmap inputs.