# Final 2 Residual Child Plan Sequence Design > Date: 2026-04-19 > Parent Framework: `2026-04-19-scene-skill-102-full-coverage-framework-plan.md` > Parent Layer: `Layer E / Route 5 + Route 6` > Upstream Board State: `framework-auto-pass = 100`, `framework-structured-fail-closed = 2` ## Intent Define the remaining bounded plan sequence after local-doc runtime closure. Only two framework structured fail-closed residuals remain: 1. `sweep-085-scene`: `host_bridge_workflow`, next action `future-host-bridge-runtime-roadmap-input` 2. `sweep-091-scene`: `page_state_eval`, next action `future-bootstrap-target-normalization-roadmap-input` This sequence prevents drift back into prior G6 micro-plans. Every next step must be anchored to this final-2 residual sequence and the 102 full coverage parent framework. ## Design Rules 1. Do not reuse the old G6 semantics micro-plan chain as an execution path. 2. Do not start host-bridge and bootstrap work in the same implementation plan. 3. Do not update the official board inside diagnostic or implementation plans. 4. Do not add a new family. 5. Do not modify unrelated mainline contracts for G1-E, G2, or G3. 6. Any implementation must target exactly one residual scene unless a later parent-framework revision expands the fixed input bucket. ## Sequence 1. `Final 2 Residual Roadmap Prioritization` Decide which residual enters implementation first. 2. `Bootstrap Target Normalization Roadmap` Bounded roadmap for `sweep-091-scene`, if selected by prioritization. 3. `Host-Bridge Runtime Roadmap` Bounded roadmap for `sweep-085-scene`, if selected by prioritization. 4. `Final 2 Official Board Reconciliation Refresh` Consume the selected roadmap output and update only framework-layer board fields. 5. `102 Framework Closure Rollup` Publish the final 102-status view after both residuals are closed or explicitly held. ## Expected End State The target end state is one of: 1. `102 framework-auto-pass`, `0 structured fail-closed` 2. `101 framework-auto-pass`, `1 structured fail-closed with named runtime hold` 3. `100 framework-auto-pass`, `2 structured fail-closed with named runtime holds` The third state is allowed only if both residuals are explicitly held by bounded decision plans.