# Final 2 Official Board Reconciliation Refresh Design > Date: 2026-04-19 > Parent Sequence: `2026-04-19-final-2-residual-child-plan-sequence-plan.md` ## Intent Apply candidate results from either bootstrap normalization or host-bridge runtime roadmap to the official board. This design is only a refresh layer. It does not decide, rerun, or implement runtime behavior. ## Inputs One or both of: 1. `tests/fixtures/generated_scene/bootstrap_target_normalization_reconciliation_candidates_2026-04-19.json` 2. `tests/fixtures/generated_scene/host_bridge_runtime_reconciliation_candidates_2026-04-19.json` ## Output The official board framework summary should reflect the selected residual roadmap result while preserving workbook and business-status fields.