# G6 Host-Bridge Entry Gate Verification Design > Date: 2026-04-19 > Status: Draft > Upstream Report: [2026-04-19-g6-host-bridge-entry-gate-report.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-gate-report.md) ## 1. Intent This design defines the next bounded slice after `G6 host-bridge entry gate`. The target is: `G6 host-bridge entry gate verification` ## 2. Why This Slice The future entry gate is now explicit. The next bounded pressure is: 1. verify the gate model itself before any later real-sample entry slice is considered ## 3. Scope Boundary This design is limited to gate verification only. It may include: 1. defining bounded verification targets for the hard gate 2. defining how fail-close reasons are checked 3. defining how gate verification narrows later `G6` entry work It must not include: 1. executing a `G6` real sample 2. implementing host-runtime directly 3. opening `G8` 4. reopening `G7` ## 4. Target Outcome The bounded target outcome is one state: 1. one bounded `G6 host-bridge entry gate verification` plan ## 5. Exit Condition This design is complete when implementation can be bounded to one plan that: 1. freezes gate-verification scope 2. defines bounded verification targets 3. emits one bounded follow-up plan