# Boundary Runtime Prerequisites Roadmap Plan > Date: 2026-04-19 > Status: Draft > Upstream Spec: [2026-04-19-boundary-runtime-prerequisites-roadmap-design.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/specs/2026-04-19-boundary-runtime-prerequisites-roadmap-design.md) ## Plan Intent This roadmap determines the next bounded prerequisites slice after the post-`G7` boundary decision concludes that direct `G6` or `G8` execution should not start yet. Its only purpose is: `select one bounded prerequisite direction before the next boundary-family real-sample attempt` ## Scope Guardrails 1. do not execute `G6` or `G8` 2. do not reopen `G7` 3. do not reopen `G1-E / G2 / G3` 4. do not implement host-runtime or local-doc runtime under this roadmap 5. do not open `G4 / G5` ## Candidate Prerequisite Directions The only candidates under this roadmap are: 1. `G6 host-bridge prerequisites` 2. `G8 local-doc prerequisites` ## Workstreams 1. `WS1` Freeze the Post-G7 Boundary Hold State 2. `WS2` Compare G6 and G8 Prerequisite Burden 3. `WS3` Select One Prerequisite Direction 4. `WS4` Publish the Next Bounded Prerequisites Slice ## Phase 0: Freeze the Starting State ### Objective Lock the roadmap start point so no closed family work is reopened. ### Tasks 1. freeze `G7` as closed 2. freeze `G6` and `G8` as held pending prerequisites 3. freeze `G1-E / G2 / G3` as closed 4. freeze `G4 / G5` as out of scope ### Deliverables 1. starting-state note 2. fixed prerequisite candidate list ### Acceptance Criteria 1. no family execution begins under this roadmap ## Phase 1: Compare Prerequisite Burden ### Objective Compare `G6` and `G8` at the prerequisite level instead of at the execution level. ### Tasks 1. restate the smallest blocked capability for `G6` 2. restate the smallest blocked capability for `G8` 3. compare which prerequisite can be isolated more cleanly ### Deliverables 1. prerequisite comparison matrix 2. smallest-prerequisite summary ### Acceptance Criteria 1. the selected prerequisite direction is justified explicitly ## Phase 2: Select One Prerequisite Direction ### Objective Reduce the post-`G7` prerequisite ambiguity to one bounded decision. ### Tasks 1. select exactly one direction: - `G6 host-bridge prerequisites` - or `G8 local-doc prerequisites` 2. record why the other direction remains held ### Deliverables 1. prerequisite direction decision 2. hold reason for the non-selected direction ### Acceptance Criteria 1. only one next direction is opened 2. the decision is bounded and defensible ## Phase 3: Publish the Next Bounded Slice ### Objective Turn the decision into the next executable bounded artifact. ### Tasks 1. write one bounded follow-up design and plan for the selected prerequisite direction 2. publish a roadmap closure report ### Deliverables 1. next bounded `design` 2. next bounded `plan` 3. roadmap closure report ### Acceptance Criteria 1. the next step is ready without extending this roadmap 2. only one bounded direction is emitted