# Final 2 Residual Child Plan Sequence Plan > Date: 2026-04-19 > Parent Framework: `2026-04-19-scene-skill-102-full-coverage-framework-plan.md` > Parent Layer: `Layer E / Route 5 + Route 6` > Status: Draft ## Plan Intent Create the remaining child-plan sequence for the last two framework structured fail-closed residuals. This plan only defines the sequence and child plan boundaries; it does not execute implementation. ## Fixed Inputs 1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 2. `tests/fixtures/generated_scene/local_doc_official_board_reconciliation_refresh_2026-04-19.json` ## Fixed Residual Bucket 1. `sweep-085-scene`: `host_bridge_workflow`, `future-host-bridge-runtime-roadmap-input` 2. `sweep-091-scene`: `page_state_eval`, `future-bootstrap-target-normalization-roadmap-input` ## Child Plans 1. `2026-04-19-final-2-residual-roadmap-prioritization-plan.md` 2. `2026-04-19-bootstrap-target-normalization-roadmap-plan.md` 3. `2026-04-19-host-bridge-runtime-roadmap-plan.md` 4. `2026-04-19-final-2-official-board-reconciliation-refresh-plan.md` 5. `2026-04-19-102-framework-closure-rollup-plan.md` ## Scope Guardrails 1. Do not modify `analyzer.rs`. 2. Do not modify `generator.rs`. 3. Do not update the official board under this sequence-definition plan. 4. Do not run a full 102 sweep under this plan. 5. Do not reopen G1-E, G2, G3, or local-doc runtime work. 6. Do not continue the old G6 micro-plan chain. ## Completion Criteria 1. The final-2 residual child plan sequence exists. 2. Each child plan declares parent route, fixed input bucket, allowed files, forbidden files, expected delta, and stop statement. 3. The next executable child plan is the prioritization plan. ## Stop Statement Stop after the final-2 child plan sequence is created. Do not execute any child plan under this sequence-definition plan.