# G2 Residual 2 Readiness Closure Plan > Date: 2026-04-19 > Status: Draft > Parent Plan: `docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md` > Parent Route: `Residual Route B` > Parent Layer: `Layer C` ## Plan Intent Close the `2` remaining `G2 / multi_mode_request` structured fail-closed records by correcting bounded readiness or contract interpretation. ## Fixed Input Bucket 1. `sweep-018-scene` / `白银线损周报` 2. `sweep-071-scene` / `台区线损大数据-月_周累计线损率统计分析` ## Allowed Files 1. `src/generated_scene/analyzer.rs` 2. `src/generated_scene/generator.rs` 3. `tests/scene_generator_test.rs` 4. route-local follow-up JSON/report assets ## Forbidden Files 1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 2. G3/G6/G8 route code unless required to preserve regression tests 3. family baseline manifests ## Tasks 1. inspect the two fixed G2 residuals; 2. determine whether readiness labels `02` and `00` are report parsing artifacts or real contract gaps; 3. implement one bounded G2 correction if justified; 4. rerun only the two fixed scenes; 5. publish delta report. ## Expected Coverage Delta Target: reduce the `2` G2 residual fail-closed records. ## Stop Statement Stop after the two-scene route-local follow-up and report. Do not continue into G1-E, G3, or boundary work.