# G3 Residual Contract Closure Plan > Date: 2026-04-19 > Status: Draft > Parent Framework Plan: `docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md` > Parent Route: `Route 2: G3 / paginated_enrichment` > Parent Layer: `Layer C + Layer D` > Upstream Design: `docs/superpowers/specs/2026-04-19-g3-residual-contract-closure-design.md` ## Plan Intent Implement the final bounded Route 2 slice for any `G3` residual contract blockers left after enrichment-request and export-plan closure work. ## Fixed Input Bucket Residual `G3 / paginated_enrichment` bucket after the first two Route 2 child plans. ## Allowed Files 1. `src/generated_scene/analyzer.rs` 2. `src/generated_scene/generator.rs` 3. `src/generated_scene/ir.rs` 4. `tests/scene_generator_test.rs` 5. route-local residual inventory and report assets ## Forbidden Files 1. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` 2. Route 3+ implementation assets ## Tasks 1. freeze post-Route-2 residual inventory 2. group residual blockers 3. implement at most one bounded residual correction slice 4. rerun bounded validation 5. declare Route 2 complete or deferred ## Expected Coverage Delta 1. shrink or explicitly name the final residual `G3` bucket 2. produce a clean handoff into Route 3 ## Completion Criteria 1. Route 2 is no longer open-ended 2. remaining residual `G3` records are explicitly categorized ## Stop Statement Stop after Route 2 is explicitly closed or deferred. Do not begin Route 3 work under this plan.