# G6 Host-Bridge Entry Readiness Plan > Date: 2026-04-19 > Status: Draft > Upstream Spec: [2026-04-19-g6-host-bridge-entry-readiness-design.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/specs/2026-04-19-g6-host-bridge-entry-readiness-design.md) ## Plan Intent This plan executes one bounded next slice: `G6 host-bridge entry readiness` ## Scope Guardrails 1. do not execute a `G6` real sample 2. do not implement host-runtime directly 3. do not open `G8` 4. do not reopen `G7` 5. do not open `G4 / G5` ## Workstreams 1. `WS1` Freeze entry-readiness scope 2. `WS2` Define bounded readiness criteria 3. `WS3` Publish one bounded readiness result ## Phase 0: Freeze the Boundary ### Objective Lock the plan to entry-readiness only. ### Tasks 1. freeze `G6` as the only target 2. freeze implementation and real execution as out of scope ### Acceptance Criteria 1. no broader host-runtime work begins under this plan ## Phase 1: Define Readiness Criteria ### Objective Turn the explicit callback verification model into bounded entry-readiness criteria. ### Tasks 1. define which semantics are required before `G6` entry can open 2. define which semantics remain optional 3. define the minimal readiness threshold ### Acceptance Criteria 1. entry-readiness criteria are explicit and bounded ## Phase 2: Publish the Bounded Result ### Objective Turn the readiness model into one bounded next artifact. ### Tasks 1. publish the readiness result 2. if needed, publish the next bounded follow-up plan ### Acceptance Criteria 1. the next step remains narrower than direct host-runtime implementation