# G7 Real-Sample Entry Plan > Date: 2026-04-19 > Status: Draft > Upstream Spec: [2026-04-19-g7-real-sample-entry-design.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/specs/2026-04-19-g7-real-sample-entry-design.md) ## Plan Intent This plan executes one bounded next slice: `G7 real-sample entry` ## Scope Guardrails 1. do not reopen mainline families 2. do not execute `G6` or `G8` 3. do not add new `G7` family fixtures 4. do not implement new runtime-platform prerequisites under this plan 5. do not open `G4 / G5` ## Fixed Verification Anchor The only target under this plan is: 1. `计量资产库存统计` ## Workstreams 1. `WS1` Freeze the G7 real-sample boundary 2. `WS2` Build the real-sample contract differential 3. `WS3` Rerun the fixed real sample against the existing G7 runtime contract 4. `WS4` Update validation assets and close the loop ## Phase 0: Freeze the Boundary ### Objective Lock the plan to one `G7` representative sample. ### Tasks 1. freeze `计量资产库存统计` as the only real-sample anchor 2. freeze existing `G7` repo-local runtime contract as the starting baseline ### Acceptance Criteria 1. no other boundary family is touched under this plan ## Phase 1: Build the Differential ### Objective Understand whether the existing `G7` runtime contract is already close enough for a real-sample rerun. ### Tasks 1. compare the representative `G7` fixture contract to the chosen real sample 2. isolate the smallest remaining contract risk ### Acceptance Criteria 1. the rerun target is explicit and bounded ## Phase 2: Real-Sample Rerun ### Objective Use the fixed real sample to test the current `G7` runtime contract. ### Tasks 1. run `sg_scene_generate` on the fixed `G7` real sample 2. record whether the result is a pass or a smaller mismatch ### Acceptance Criteria 1. the outcome is narrower than `not yet executed` ## Phase 3: Validation Closure ### Objective Write the result back into the validation layer and close the bounded slice. ### Tasks 1. update validation assets if the outcome narrows 2. write a closure report ### Acceptance Criteria 1. the next boundary-family ambiguity is reduced further without broadening roadmap scope