# Post-G7 Boundary Decision Roadmap Plan > Date: 2026-04-19 > Status: Draft > Upstream Spec: [2026-04-19-post-g7-boundary-decision-roadmap-design.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/specs/2026-04-19-post-g7-boundary-decision-roadmap-design.md) ## Plan Intent This roadmap determines the next bounded step after `G7` has already closed as the first boundary-family executed real sample. Its only purpose is: `decide whether G6 or G8 may enter real-sample execution scope next, or whether both remain held pending prerequisites` ## Scope Guardrails 1. do not reopen `G7` 2. do not reopen `G1-E / G2 / G3` 3. do not implement runtime-platform prerequisites under this roadmap 4. do not execute real samples for more than one remaining boundary family 5. do not open `G4 / G5` ## Candidate Directions The only remaining directions under this roadmap are: 1. `G6` 2. `G8` 3. `prerequisites-only hold` ## Workstreams 1. `WS1` Freeze the Post-G7 Starting State 2. `WS2` Compare G6 and G8 Entry Cost 3. `WS3` Select One Next Direction 4. `WS4` Publish the Next Bounded Slice ## Phase 0: Freeze the Starting State ### Objective Lock the roadmap start point so the decision cannot drift back into closed work. ### Tasks 1. freeze `G7` as closed executed-pass 2. freeze `G6` and `G8` as the only remaining boundary candidates 3. freeze `G1-E / G2 / G3` as closed 4. freeze `G4 / G5` as out of scope ### Deliverables 1. starting-state note 2. fixed candidate list ### Acceptance Criteria 1. no closed family is reopened under this roadmap ## Phase 1: Compare the Remaining Boundary Candidates ### Objective Compare `G6` and `G8` using explicit entry cost and prerequisite pressure. ### Tasks 1. restate the current hold condition for `G6` 2. restate the current hold condition for `G8` 3. compare which one requires the smaller new capability to enter real-sample scope 4. compare whether either direction is still too expensive and should remain held ### Deliverables 1. `G6 vs G8` comparison matrix 2. smallest-next-step summary ### Acceptance Criteria 1. the preferred next direction is justified explicitly 2. the non-selected direction has an explicit hold reason ## Phase 2: Select One Next Direction ### Objective Reduce the post-`G7` ambiguity to one bounded decision. ### Tasks 1. select exactly one direction: - `G6` - `G8` - or `prerequisites-only hold` 2. record why the other directions remain out of scope ### Deliverables 1. post-`G7` boundary decision 2. hold reasons for non-selected directions ### Acceptance Criteria 1. only one next direction is opened 2. the decision is bounded and defensible ## Phase 3: Publish the Next Bounded Slice ### Objective Turn the decision into the next executable bounded artifact. ### Tasks 1. if `G6` is selected, write a bounded `G6 real-sample entry` design and plan 2. if `G8` is selected, write a bounded `G8 real-sample entry` design and plan 3. if `prerequisites-only hold` is selected, write a bounded prerequisites roadmap 4. publish a roadmap closure report ### Deliverables 1. next bounded `design` 2. next bounded `plan` 3. roadmap closure report ### Acceptance Criteria 1. the next step is ready without extending this roadmap 2. only one bounded direction is emitted ## Completion Criteria This roadmap is complete when: 1. the post-`G7` next step is reduced to one bounded direction 2. `G6` and `G8` no longer compete ambiguously 3. a single follow-up `design + plan` exists for the selected direction ## Next Step After this roadmap completes: 1. execute the selected bounded slice 2. do not reopen this roadmap during execution