# Residual 13 Follow-Up Sweep And Reconciliation Plan > Date: 2026-04-19 > Status: Draft > Parent Plan: `docs/superpowers/plans/2026-04-19-structured-fail-closed-residual-13-closure-plan.md` > Parent Route: `Residual Route E` > Parent Layer: `Layer E` ## Plan Intent Measure the cumulative delta after residual Routes A through D complete. ## Fixed Input Bucket The fixed input bucket is the same `13` residual scenes from the parent residual closure plan. ## Allowed Files 1. residual follow-up JSON asset 2. residual reconciliation candidate JSON asset 3. residual follow-up report 4. residual reconciliation report ## Forbidden Files 1. `src/generated_scene/analyzer.rs` 2. `src/generated_scene/generator.rs` 3. `tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json` ## Tasks 1. rerun the fixed 13 residual scenes; 2. classify raw statuses; 3. apply promotion policy; 4. report remaining residual count. ## Stop Statement Stop after residual follow-up and reconciliation reports.