# Boundary Family Entry Decision Report > Date: 2026-04-19 > Roadmap: [2026-04-19-boundary-family-real-sample-entry-roadmap-plan.md](D:/data/ideaSpace/rust/sgClaw/claw-new/docs/superpowers/plans/2026-04-19-boundary-family-real-sample-entry-roadmap-plan.md) ## Decision One boundary family is selected as the next real-sample entry candidate: 1. `G7` The other boundary families remain held: 1. `G6` 2. `G8` ## Comparison Result ### G6 `G6` already has a code-backed minimum runtime contract, but the next real-sample step would require host bridge execution semantics. That prerequisite is still too platform-shaped for the smallest bounded next slice. ### G7 `G7` already has a minimal runnable runtime contract and only lacks real multi-endpoint aggregation verification. Among `G6/G7/G8`, this is the smallest next capability gap. So `G7` is selected. ### G8 `G8` already has a code-backed minimum runtime contract, but the next real-sample step still depends on local document pipeline runtime and attachment handling. That remains heavier than the bounded next-step budget. ## Result The roadmap now has one bounded next direction: 1. `G7 real-sample entry` This report does not execute a real sample yet. It only closes the boundary-family priority ambiguity.