1.7 KiB
1.7 KiB
G3 Export Plan Closure Plan
Date: 2026-04-19 Status: Draft Parent Framework Plan:
docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Route:Route 2: G3 / paginated_enrichmentParent Layer:Layer C + Layer DUpstream Design:docs/superpowers/specs/2026-04-19-g3-export-plan-closure-design.md
Plan Intent
Implement the second bounded G3 contract-recovery slice by recovering repeated export-plan evidence gaps inside the remaining paginated_enrichment fail-closed bucket.
Fixed Input Bucket
paginated_enrichment + g3_export_plan + export_plan
Allowed Files
src/generated_scene/analyzer.rssrc/generated_scene/generator.rssrc/generated_scene/ir.rstests/scene_generator_test.rs- route-local follow-up JSON and report assets
Forbidden Files
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json- Route 3+ plan files
- promotion policy assets
Tasks
- freeze the targeted export-plan subgroup
- confirm repeated
export_planandg3_export_planmissing pattern - implement one bounded export-plan recovery slice
- rerun bounded validation only for this subgroup
- publish delta and residual Route 2 inventory
Expected Coverage Delta
- reduce the count of
paginated_enrichmentrecords whose primary blocker is export-plan absence - preserve stable
G3canonical and real-sample anchors
Completion Criteria
- export-plan subgroup count is lower or more narrowly classified
- residual Route 2 bucket is explicitly measured
Stop Statement
Stop after the export-plan subgroup has been rerun and measured.
Do not continue into Route 2 residual closure under this plan.