Files
claw/docs/superpowers/plans/2026-04-19-residual-runtime-roadmap-prioritization-plan.md

1.6 KiB

Residual Runtime Roadmap Prioritization Plan

Date: 2026-04-19 Parent Framework: 2026-04-19-scene-skill-102-full-coverage-framework-plan.md Parent Layer: Layer E Status: Active

Plan Intent

Select the next roadmap from the three residual inputs after official board reconciliation.

Fixed Inputs

  1. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
  2. tests/fixtures/generated_scene/official_board_reconciliation_2026-04-19.json

Allowed Files

  1. tests/fixtures/generated_scene/residual_runtime_roadmap_prioritization_2026-04-19.json
  2. docs/superpowers/reports/2026-04-19-residual-runtime-roadmap-prioritization-report.md
  3. selected next roadmap design
  4. selected next roadmap plan

Forbidden Files

  1. src/generated_scene/analyzer.rs
  2. src/generated_scene/generator.rs
  3. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

Tasks

  1. Load official board residual records.
  2. Group residuals by next action.
  3. Score local-doc runtime, host-bridge runtime, and bootstrap target normalization.
  4. Select exactly one next roadmap.
  5. Publish prioritization JSON.
  6. Publish prioritization report.
  7. Create design/plan for the selected roadmap only.

Completion Criteria

  1. All 7 residual records are represented.
  2. Exactly one selected roadmap exists.
  3. Non-selected roadmaps are deferred with reasons.
  4. No implementation file is modified.

Stop Statement

Stop after prioritization assets and the selected next roadmap design/plan are published. Do not execute the selected roadmap under this plan.