Post-Roadmap Execution Closure Report

Date: 2026-04-18 Scope: docs/superpowers/plans/2026-04-18-scene-skill-post-roadmap-execution-plan.md Result: Completed

1. Conclusion

The post-roadmap execution plan has been closed within its own boundary.

The completed outputs now exist for all required phases:

  1. Phase 0: handover boundary asset
  2. Phase 1: minimum current execution board
  3. Phase 2: real-sample validation layer
  4. Phase 3: boundary and runtime entry rules
  5. Phase 4: bounded next-roadmap design and plan

2. Delivered Assets

Phase 0

  1. tests/fixtures/generated_scene/post_roadmap_handover_2026-04-18.json

Phase 1

  1. tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

Phase 2

  1. tests/fixtures/generated_scene/real_sample_validation_plan_2026-04-18.json
  2. tests/fixtures/generated_scene/real_sample_validation_record_template_2026-04-18.json
  3. tests/fixtures/generated_scene/real_sample_validation_records_2026-04-18.json
  4. tests/fixtures/generated_scene/real_sample_mismatch_taxonomy_2026-04-18.json

Phase 3

  1. tests/fixtures/generated_scene/boundary_runtime_entry_rules_2026-04-18.json

Phase 4

  1. docs/superpowers/specs/2026-04-18-scene-skill-real-sample-validation-roadmap-design.md
  2. docs/superpowers/plans/2026-04-18-scene-skill-real-sample-validation-roadmap-plan.md

3. Key Outcome

The most important change is not a new compiler feature.

It is the separation of:

  1. frozen workbook snapshot
  2. current execution-board state
  3. real-sample validation state
  4. next-roadmap scope decisions

That separation prevents the next execution round from drifting back into asset-only refinement.

4. Real-Sample Validation Status

The first-round validation layer now records:

  1. G2 as an executed mismatch anchor
  2. G1-E as an executed pass anchor
  3. G3 as a selected real-sample anchor that still needs an executed real run

This means the next roadmap can be validation-first rather than fixture-first.

5. Boundary Control

G6/G7/G8 remain boundary families.

G4/G5 remain deferred or degraded.

No new implementation scope was opened inside this plan.

6. Verification

The post-roadmap execution assets are now covered by:

  1. cargo test --test post_roadmap_execution_assets_test -- --nocapture

This verification is in addition to the already existing family, ledger, and roadmap asset tests.