1.2 KiB
1.2 KiB
Boundary Runtime Prerequisites Decision Report
Date: 2026-04-19 Roadmap: 2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md
Decision
One bounded prerequisite direction is selected:
G6 host-bridge prerequisites
The following prerequisite direction remains held:
G8 local-doc prerequisites
Comparison Result
G6 Host-Bridge Prerequisites
G6 is blocked by one clearer prerequisite line:
- host bridge real-sample execution semantics
That is still platform-shaped, but it is narrower than the combined local-doc burden on G8.
So G6 host-bridge prerequisites is selected.
G8 Local-Doc Prerequisites
G8 is blocked by a broader prerequisite bundle:
- local document runtime
- attachment handling
That bundle is heavier than the next bounded slice should absorb.
So G8 local-doc prerequisites remains held.
Result
The roadmap now has one bounded next direction:
G6 host-bridge prerequisites
This report does not implement the prerequisite.
It only closes the prerequisite priority ambiguity.