810 B
810 B
Boundary Runtime Prerequisites Roadmap Closure Report
Date: 2026-04-19 Roadmap: 2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md
Result
This roadmap is closed with one bounded next direction:
G6 host-bridge prerequisites
What Was Closed
G6andG8no longer compete ambiguously at the prerequisite level- one follow-up bounded
design + plannow exists for the selected prerequisite direction
Hold Result
The following direction remains held:
G8 local-doc prerequisites
The deferred families remain untouched:
G4G5
Next Step
Execute the bounded G6 host-bridge prerequisites plan rather than reopening this roadmap.