Files
claw/docs/superpowers/reports/2026-04-19-boundary-runtime-prerequisites-roadmap-closure-report.md

810 B

Boundary Runtime Prerequisites Roadmap Closure Report

Date: 2026-04-19 Roadmap: 2026-04-19-boundary-runtime-prerequisites-roadmap-plan.md

Result

This roadmap is closed with one bounded next direction:

  1. G6 host-bridge prerequisites

What Was Closed

  1. G6 and G8 no longer compete ambiguously at the prerequisite level
  2. one follow-up bounded design + plan now exists for the selected prerequisite direction

Hold Result

The following direction remains held:

  1. G8 local-doc prerequisites

The deferred families remain untouched:

  1. G4
  2. G5

Next Step

Execute the bounded G6 host-bridge prerequisites plan rather than reopening this roadmap.