Files
claw/docs/superpowers/reports/2026-04-19-final-2-residual-roadmap-prioritization-report.md

1.6 KiB

Final 2 Residual Roadmap Prioritization Report

Date: 2026-04-19 Plan: 2026-04-19-final-2-residual-roadmap-prioritization-plan.md Parent sequence: 2026-04-19-final-2-residual-child-plan-sequence-plan.md

Scope

This decision consumed the current official board state after local-doc reconciliation refresh. Only two framework structured fail-closed residuals remain:

Scene id Scene name Current archetype Next action
sweep-085-scene 计量资产库存统计 host_bridge_workflow future-host-bridge-runtime-roadmap-input
sweep-091-scene 配网异常设备监控统计 page_state_eval future-bootstrap-target-normalization-roadmap-input

No code was changed, and the official board was not updated by this plan.

Decision

Selected first roadmap:

bootstrap target normalization roadmap

Selected plan:

2026-04-19-bootstrap-target-normalization-roadmap-plan.md

Rationale

Bootstrap target normalization is the narrower next step:

  1. It is a single-scene residual.
  2. It targets deterministic bootstrap target recovery or a narrower named hold.
  3. It avoids host-runtime transport semantics.
  4. It has lower regression risk against already passing host-bridge paths.

Host-bridge runtime remains queued:

2026-04-19-host-bridge-runtime-roadmap-plan.md

Output Asset

Decision asset:

tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json

Closure

This prioritization plan is complete. The next executable plan is:

docs/superpowers/plans/2026-04-19-bootstrap-target-normalization-roadmap-plan.md