Files
claw/docs/superpowers/reports/2026-04-19-g2-remaining-fail-closed-closure-report.md

2.2 KiB

G2 Remaining Fail-Closed Closure Report

Date: 2026-04-19

Parent framework: 2026-04-19-scene-skill-102-full-coverage-framework-plan

Parent route: Route 3 / G2 multi_mode_request closure

Plan: 2026-04-19-g2-remaining-fail-closed-closure-plan.md

Scope

This report closes the fixed Route 3 bucket:

  • multi_mode_request structured fail-closed scenes: 4
  • Primary blocker: g2_request_contract / request_mode_contract
  • Allowed implementation area: bounded G2 mode request contract closure

This run did not update scene_execution_board_2026-04-18.json, did not create a new family, and did not begin Route 4.

Implementation

The generator now fills empty auto-inferred G2 mode requestTemplate values with bounded mode-specific defaults.

Examples:

  • month: { "page": 1, "rows": 20, "tjzq": "month" }
  • week: { "page": 1, "rows": 20, "tjzq": "week" }
  • prediction: { "page": 1, "rows": 60, "reportType": "predictionCompute" }

The fallback is limited to automatically inferred multi_mode_request IR. Explicitly provided incomplete scene_ir_json remains fail-closed.

Results

Scene ID Scene Baseline Follow-up Result
sweep-020-scene 供电所线路电量统计 C / fail-closed A / auto-pass resolved
sweep-023-scene 供电质量看板-武威 C / fail-closed A / auto-pass resolved
sweep-070-scene 电量、站损自动采集上报 C / fail-closed A / auto-pass resolved
sweep-083-scene 营销业务管控监测日报表 C / fail-closed A / auto-pass resolved

Summary:

  • Before: 4 G2 structured fail-closed scenes
  • Resolved to auto-pass: 4
  • Remaining Route 3 fail-closed: 0
  • Route-local coverage delta: +4

Verification

Commands:

cargo test --test scene_generator_test generator_fills_empty_g2_mode_request_templates -- --nocapture
cargo test --test scene_generator_test generator_blocks_incomplete_multi_mode_contract -- --nocapture

Route-local rerun output:

examples/g2_remaining_fail_closed_closure_followup_2026-04-19

Stop Statement

Route 3 is closed. The next child plan in the 102 full-coverage sequence is Route 4:

2026-04-19-g1e-remaining-fail-closed-closure-plan.md