1.3 KiB
1.3 KiB
G3 Residual 4 Workflow Evidence Closure Report
Date: 2026-04-19 Plan:
docs/superpowers/plans/2026-04-19-g3-residual-4-workflow-evidence-closure-plan.md
Scope
This bounded route recovered G3 residual workflow evidence for four fixed paginated-enrichment residual scenes. It did not enter G2 or boundary residual work.
Summary
| Status | Count |
|---|---|
| pass | 4 |
| fail-closed | 0 |
| source-unreadable | 0 |
| unknown | 0 |
Scene Results
| Scene | Status | Readiness | Archetype | Missing Pieces |
|---|---|---|---|---|
| 95598供电服务月报 | pass | A | paginated_enrichment | - |
| 故障报修工单信息统计表 | pass | A | paginated_enrichment | - |
| 输变电设备运行分析报告 | pass | A | paginated_enrichment | - |
| 巡视计划完成情况自动检索 | pass | A | paginated_enrichment | - |
Implementation Slice
- Recovered G3 export methods ending with
Fn, such asexcelExportFn. - Recovered G3 export methods ending with
ExcelFile, such asaSaveExcelFile. - Expanded G3 operational join-key hints to include report/org/user style keys when present in source evidence.
Stop Statement
The four-scene route-local follow-up and report are published. No G2 or boundary residual work is started by this plan.