Files
claw/docs/superpowers/reports/2026-04-19-g6-host-bridge-entry-gate-closure-report.md

755 B

G6 Host-Bridge Entry Gate Closure Report

Date: 2026-04-19 Plan: 2026-04-19-g6-host-bridge-entry-gate-plan.md

Result

This plan is closed with one bounded future entry gate model:

  1. three hard gate conditions
  2. two soft conditions
  3. three fail-close reasons

What Was Closed

  1. G6 future entry gate is now explicit
  2. hard vs soft conditions are now separated
  3. one bounded follow-up design + plan now exists

Hold Result

The following direction remains untouched:

  1. G8 local-doc prerequisites

Next Step

Execute the bounded G6 host-bridge entry gate verification plan rather than reopening this gate slice.