1.2 KiB
Post-G7 Boundary Decision Report
Date: 2026-04-19 Roadmap: 2026-04-19-post-g7-boundary-decision-roadmap-plan.md
Decision
One bounded next direction is selected:
prerequisites-only hold
The following boundary families remain held:
G6G8
Comparison Result
G6
G6 still needs stronger host-bridge real execution semantics than the current bounded next-step budget allows.
So G6 remains held.
G8
G8 still needs local document runtime and attachment handling beyond current repo-local coverage.
So G8 remains held.
Prerequisites-Only Hold
After G7 has already closed as an executed boundary-family sample, the safest bounded next step is no longer another direct family-entry attempt.
The smaller next direction is to scope the remaining prerequisites first.
So prerequisites-only hold is selected.
Result
The roadmap now has one bounded next direction:
boundary runtime prerequisites roadmap
This report does not implement any prerequisite.
It only closes the post-G7 boundary ambiguity.