Files
claw/docs/superpowers/reports/2026-04-19-scene-skill-102-framework-closure-rollup-report.md

1.5 KiB

Scene Skill 102 Framework Closure Rollup Report

Date: 2026-04-19 Plan: 2026-04-19-102-framework-closure-rollup-plan.md Parent framework: 2026-04-19-scene-skill-102-full-coverage-framework-plan.md

Result

Metric Count
total scenes 102
framework-auto-pass 102
framework-structured-fail-closed 0
source-unreadable 0
missing-source 0
unsupported-family 0
misclassified-unresolved 0
unresolved-followup-status 0
unresolved total 0

Closure status: complete

Remaining Structured Fail-Closed

None.

Interpretation

The 102-scene set is closed at the framework layer: every scene now has a framework auto-pass status in the official board.

This is not the same as saying every scene has real-sample executed-pass validation. Real-sample validation remains a separate layer. The framework closure means the generator/analyzer framework can classify and generate a bounded skill package path for all 102 scenes without unresolved timeout, unsupported-family, unresolved route conflict, or structured fail-closed residual.

Inputs

  • tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json
  • tests/fixtures/generated_scene/final_2_official_board_reconciliation_refresh_2026-04-19.json

Closure

The 102 full coverage parent framework has reached framework-level closure. Further work should be planned as a new validation or production-hardening roadmap, not as continuation of unresolved framework coverage.