G6 Host-Bridge Entry Gate Verification Design
Date: 2026-04-19 Status: Draft Upstream Report: 2026-04-19-g6-host-bridge-entry-gate-report.md
1. Intent
This design defines the next bounded slice after G6 host-bridge entry gate.
The target is:
G6 host-bridge entry gate verification
2. Why This Slice
The future entry gate is now explicit.
The next bounded pressure is:
- verify the gate model itself before any later real-sample entry slice is considered
3. Scope Boundary
This design is limited to gate verification only.
It may include:
- defining bounded verification targets for the hard gate
- defining how fail-close reasons are checked
- defining how gate verification narrows later
G6entry work
It must not include:
- executing a
G6real sample - implementing host-runtime directly
- opening
G8 - reopening
G7
4. Target Outcome
The bounded target outcome is one state:
- one bounded
G6 host-bridge entry gate verificationplan
5. Exit Condition
This design is complete when implementation can be bounded to one plan that:
- freezes gate-verification scope
- defines bounded verification targets