1.4 KiB
1.4 KiB
G6 Host-Bridge Execution Semantics Design
Date: 2026-04-19 Status: Draft Upstream Report: 2026-04-19-g6-host-bridge-prerequisites-report.md
1. Intent
This design defines the next bounded slice after G6 host-bridge prerequisites isolates the minimum blocked capability.
The target is:
G6 host-bridge execution semantics
2. Why This Slice
This slice is selected because the remaining G6 gap is narrower than broad host-runtime implementation:
- bridge action invocation semantics
- callback completion semantics
3. Scope Boundary
This design is limited to semantic scoping only.
It may include:
- defining the minimum bridge action semantic
- defining the minimum callback completion semantic
- defining how those semantics bound later
G6real-sample entry
It must not include:
- implementing host-runtime directly
- executing a
G6real sample - opening
G8 - reopening
G7
4. Target Outcome
The bounded target outcome is one state:
- one bounded
G6 host-bridge execution semanticsplan
5. Exit Condition
This design is complete when implementation can be bounded to one plan that:
- freezes the semantic boundary
- separates bridge invocation from callback completion
- emits one bounded follow-up plan