Files
claw/docs/superpowers/reports/2026-04-19-official-board-reconciliation-report.md

3.3 KiB

Official Board Reconciliation Report

Date: 2026-04-19 Plan: docs/superpowers/plans/2026-04-19-official-board-reconciliation-plan.md Parent Framework: docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.md Status: Completed

Scope

This report records the official execution board reconciliation from the final 102-scene coverage rollup.

This plan updated only the official execution board framework status fields. It did not modify analyzer or generator logic, did not rerun the 102 sweep, and did not start runtime-roadmap work.

Inputs

  • tests/fixtures/generated_scene/final_coverage_status_rollup_2026-04-19.json
  • tests/fixtures/generated_scene/promotion_board_reconciliation_policy_2026-04-19.json
  • tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

Updated Board

  • tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json

The board now contains framework-level fields for every scene:

  • currentFrameworkStatus
  • currentFrameworkCandidateStatus
  • currentFrameworkArchetype
  • currentFrameworkReadiness
  • currentFrameworkSource
  • currentFrameworkDecisionOverlay
  • currentFrameworkNextAction
  • currentFrameworkCanAutoUpdateBoard

Frozen workbook snapshot fields were preserved.

Final Framework Status Counts

Framework status Count
framework-auto-pass 95
framework-structured-fail-closed 7
framework-valid-host-bridge 0
source-unreadable 0
missing-source 0
unsupported-family 0
misclassified-unresolved 0
unresolved-followup-status 0

Remaining Structured Fail-Closed Records

Scene ID Scene Overlay Next action
sweep-033-scene 供电可靠率指标统计表 hold-for-local-doc-runtime-roadmap future-local-doc-runtime-roadmap-input
sweep-034-scene 供电可靠性数据质量自查报告月报 hold-for-local-doc-runtime-roadmap future-local-doc-runtime-roadmap-input
sweep-042-scene 国网金昌供电公司营商环境周例会报告 hold-for-local-doc-runtime-roadmap future-local-doc-runtime-roadmap-input
sweep-051-scene 嘉峪关可靠性分析报告 hold-for-local-doc-runtime-roadmap future-local-doc-runtime-roadmap-input
sweep-074-scene 同兴智能安全督查日报 hold-for-local-doc-runtime-roadmap future-local-doc-runtime-roadmap-input
sweep-085-scene 业扩报装管理制度 hold-for-host-bridge-runtime-roadmap future-host-bridge-runtime-roadmap-input
sweep-091-scene 用户停电频次分析监测 isolate-bootstrap-target-residual future-bootstrap-target-normalization-roadmap-input

Reconciliation Asset

  • tests/fixtures/generated_scene/official_board_reconciliation_2026-04-19.json

Conclusion

Official board reconciliation is complete.

The 102-scene board now has no unresolved framework status. The next bounded step should be to decide which of the three residual roadmap inputs to open first:

  1. local-doc runtime roadmap for the five local_doc_pipeline residuals;
  2. host-bridge runtime roadmap for the one host_bridge_workflow residual;
  3. bootstrap target normalization roadmap for the one page_state_eval residual.