Structured Fail-Closed Residual 13 Closure Design
Date: 2026-04-19 Status: Draft Parent Framework:
docs/superpowers/plans/2026-04-19-scene-skill-102-full-coverage-framework-plan.mdParent Layer:Layer CandLayer DUpstream Asset:tests/fixtures/generated_scene/full_coverage_reconciliation_candidates_2026-04-19.json
Intent
Close or explicitly defer the remaining 13 framework-structured-fail-closed scenes after the 102 full-coverage follow-up sweep.
This design does not update the official execution board. It defines how the remaining residual bucket must be split before any implementation work starts.
Current Residual Bucket
The current residual bucket contains 13 scenes:
| Archetype | Count | Direction |
|---|---|---|
paginated_enrichment |
4 | mainline residual closure |
multi_mode_request |
2 | mainline residual closure |
local_doc_pipeline |
5 | boundary hold or future G8 runtime roadmap |
host_bridge_workflow |
1 | boundary hold or future G6 runtime roadmap |
page_state_eval |
1 | bootstrap target isolation |
Fixed Residual Scenes
| Scene ID | Scene | Archetype | Reason |
|---|---|---|---|
sweep-007-scene |
95598供电服务月报 |
paginated_enrichment |
workflow evidence incomplete |
sweep-018-scene |
白银线损周报 |
multi_mode_request |
readiness not A/B |
sweep-033-scene |
供电可靠率指标统计表 |
local_doc_pipeline |
workflow evidence incomplete |
sweep-034-scene |
供电可靠性数据质量自查报告月报 |
local_doc_pipeline |
workflow evidence incomplete |
sweep-039-scene |
故障报修工单信息统计表 |
paginated_enrichment |
workflow evidence incomplete |
sweep-042-scene |
国网金昌供电公司营商环境周例会报告 |
local_doc_pipeline |
workflow evidence incomplete |
sweep-051-scene |
嘉峪关可靠性分析报告 |
local_doc_pipeline |
workflow evidence incomplete |
sweep-068-scene |
输变电设备运行分析报告 |
paginated_enrichment |
workflow evidence incomplete |
sweep-071-scene |
台区线损大数据-月_周累计线损率统计分析 |
multi_mode_request |
readiness not A/B |
sweep-074-scene |
同兴智能安全督查日报 |
local_doc_pipeline |
workflow evidence incomplete |
sweep-084-scene |
巡视计划完成情况自动检索 |
paginated_enrichment |
workflow evidence incomplete |
sweep-085-scene |
业扩报装管理制度 |
host_bridge_workflow |
workflow evidence incomplete |
sweep-091-scene |
用户停电频次分析监测 |
page_state_eval |
readiness not A/B |
Route Mapping
This residual bucket must be split into bounded child work:
Residual Route A:G3 / paginated_enrichmentresidual closure for 4 scenes.Residual Route B:G2 / multi_mode_requestresidual closure for 2 scenes.Residual Route C: boundary hold decision for local-doc and host-bridge residuals.Residual Route D: bootstrap target isolation for the page-state residual.Residual Route E: follow-up mini sweep and reconciliation candidate refresh.
Guardrails
- Do not update
tests/fixtures/generated_scene/scene_execution_board_2026-04-18.json. - Do not add new families.
- Do not start
G4/G5. - Do not relax readiness gates.
- Do not merge boundary runtime work with mainline contract closure.
- Do not classify local-doc residuals as mainline pass without a separate G8 runtime roadmap.
- Do not classify host-bridge residuals as mainline pass without a separate G6 runtime roadmap.
Implementation Boundaries
Allowed implementation routes:
G3residual workflow evidence recovery.G2residual request/response/mode readiness correction.
Decision-only routes:
local_doc_pipelineresiduals.host_bridge_workflowresidual.page_state_eval/bootstrap_targetresidual.
Completion Criteria
This residual design is complete when:
- all 13 scenes are assigned to one residual route;
- the mainline residual routes have bounded implementation plans;
- boundary and bootstrap residuals have explicit hold/isolate decisions;
- a follow-up mini sweep plan exists to measure the residual closure delta.