1.6 KiB
Final 2 Residual Roadmap Prioritization Report
Date: 2026-04-19 Plan:
2026-04-19-final-2-residual-roadmap-prioritization-plan.mdParent sequence:2026-04-19-final-2-residual-child-plan-sequence-plan.md
Scope
This decision consumed the current official board state after local-doc reconciliation refresh. Only two framework structured fail-closed residuals remain:
| Scene id | Scene name | Current archetype | Next action |
|---|---|---|---|
sweep-085-scene |
计量资产库存统计 |
host_bridge_workflow |
future-host-bridge-runtime-roadmap-input |
sweep-091-scene |
配网异常设备监控统计 |
page_state_eval |
future-bootstrap-target-normalization-roadmap-input |
No code was changed, and the official board was not updated by this plan.
Decision
Selected first roadmap:
bootstrap target normalization roadmap
Selected plan:
2026-04-19-bootstrap-target-normalization-roadmap-plan.md
Rationale
Bootstrap target normalization is the narrower next step:
- It is a single-scene residual.
- It targets deterministic bootstrap target recovery or a narrower named hold.
- It avoids host-runtime transport semantics.
- It has lower regression risk against already passing host-bridge paths.
Host-bridge runtime remains queued:
2026-04-19-host-bridge-runtime-roadmap-plan.md
Output Asset
Decision asset:
tests/fixtures/generated_scene/final_2_residual_roadmap_prioritization_2026-04-19.json
Closure
This prioritization plan is complete. The next executable plan is:
docs/superpowers/plans/2026-04-19-bootstrap-target-normalization-roadmap-plan.md